Hussey & Co industrial shed

Project overview

ON-SITE BUILD TIME

Fifteen weeks

PROJECT VALUE 

$250k - $300k

BUILDING DIMENSIONS

47m x 15m x 7.5m high

30m x 21m x 7.5m high 

PROJECT COLLABORATORS

Rigg Drafting Pty Ltd

Consulting geologist 

Fire engineer 

Hussey & Co coolstore 

Client/company

Hussey & Co is a horticultural company that grows and packages premium salads, being the largest exporter of baby leaf salad mixes in Australia. All products by Hussey & Co are grown on Victorian farms, with their processing factory located on the Mornington Peninsula. 

The brief 

Hussey & Co reached out to us to help them design and build an economical cool storage shed for packing and loading products ready for sale. The shed needed to incorporate coolroom panel and be designed to include a ramped loading dock. 

Being so impressed with the completed project, they contacted us for a second building that would attach to an existing coolroom shed. The new structure was also designed for coolroom paneling and truck loading bays.

Hussey & Co coolstore shed

Our scope and build details 

  • Structural steel drawings, engineering certification and computations.
  • Engineering of cool room panel loadings hanging from our structure.
  • Structural concrete engineering including raft slab design for office.
  • Engineering of dug in loading ramps and loading docks including specialised foundations details.
  • 3D structural/shop steel drawings.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts.
  • Box gutter and drainage design, including between existing and new buildings.
  • Cantilever canopies over truck loading bays.
Hussey & Co coolstore drawings
Hussey & Co coolstore shed

Challenges and solutions

Both buildings required a lot of consideration as they were to be constructed on sites with existing infrastructure - The new sheds needed to match surrounding buildings. We needed to engineer and design our steel frame to accommodate coolroom panel and allow for exposed footings in preparation for future pit and ramp construction. 

Working with specific clearance heights and site constraints, we designed some walls to be internally clad. A small cavity between the roof and the top of coolroom paneling presented a potential bird issue. We solved this by adding apron cladding around the building.  