Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

 Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Powercor industrial depot 2_gallery

The building needed to have a 50m clear span width to accommodate servicing inside as well as a fire isolation section and a truck wash.

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Perry Demolition combined office and warehouse 5_gallery

Combined office and warehouse 

Perry Demolition's requirements were for a new premises that included a stylish reception area with a double-storey void, a unique façade, and angled canopies, including a deck. 

View case study

Tyabb Aerodrome aircraft hangars

Project overview

We have previously built hangars at the airfield. Based on our client's satisfaction with our customer service and product, stakeholders sought our services again to design, supply, and install two hangars for multi-tenant use. 

Project Value: 

  • $316K*

Building dimensions:

  • Two of 18m x 44m x 6m

On-site build time:

  • 2 months

Our scope and build details:

  • Design and supply of structural steel, external cladding and footings.
  • Adjustment of design to accommodate unique firewall requirements. 
  • Installation of hangar doors on both lengths of building. 
  • Facilitating installation via a third-party installer.

Job site location:

  • Morning Peninsula, Victoria

*All prices are an indication only and are subject to change at any time due to industry steel prices. The prices also do not include erection or site preparation.

Tyabb aerodome aircraft hangar
Tyabb Aerodrome airplane hangar
Tyabb Aerodrome aircraft shed
Tyabb Aerodrome hangar drawings

Challenges and solutions

Maximising accessibility for the aircraft was paramount for ease of use when designing these hangars. Due to taxiways being on both ends of the hangar, CSB worked with the client to include large hangar doors on both lengths of the hangar. This promotes safe traffic flow whilst minimising 'hangar rash'. 

To allow for multi-tenant use, we designed the hangars around the client's internal partition speed panel firewalls (through the center of both hangars). These firewalls were installed after our scope of the project was complete. 

Love what you see?

Get an obligation free quote today.