Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

Professionally designed dairy barns built for success. Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Serafin Ag Pro combined showroom and workshop 2_gallery

The structure was divided into several purpose-built spaces including retail services and display, offices, amenities, equipment services, and spare parts sales. 

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Leader industrial warehouse 3_gallery

NMGS industrial warehouse 

The new warehouse needed to fit in with the existing infrastructure onsite and feature 10m eave heights to increase vertical storage capacity. 

View case study

Burwood Heights Primary School ball court cover

Project overview

The principal of Burwood Heights contacted us with the vision of an aesthetically pleasing ball court cover that would compliment the existing school layout and architecture. The cover needed to be functional and safe, leaving obstacle-free room for runoff around the court.

Project Value: 

  • $250K*

On-site build time:

  • 2 weeks

Job site location:

  • Burwood Heights, New South Wales

Project collaborators:

  • Third-party installer
  • Tekcon Group

Our scope and build details:

  • Structural steel drawings.
  • Engineering certification and computations.
  • Structural concrete engineering including raft slab design for office. 
  • 3D structural/shop steel drawings. 
  • Fabricated hot dipped galvanised steel package. 
  • Roof purlins and cladding.
  • Building permit. 
  • Above ground storm water.
  • Bird caps. 
  • Eave overhang. 
  • Service location and spoils removal.
  • Building installation. 

*All prices are an indication only and are subject to change at any time due to industry steel prices. The prices also do not include erection or site preparation.

Burwood Heights court cover
Burwood Heights Primary School ball court cover
Burwood Heights Primary School recreational cover shed
Burwood Primary ball court cover drawings

Challenges and solutions

Several site challenges were identified during the design process of the ball court cover. Ground fall across the court adjusted the design and proposed footing locations were changed due to underground services running underneath the site. 

To keep the court cover obstacle-free and safe, all bracing was kept above 3m. The building was installed during school holidays to help minimise disruption within the school and to keep students safe from construction site hazards. 

Love what you see?

Get an obligation free quote today.