Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

 Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Powercor industrial depot 2_gallery

The building needed to have a 50m clear span width to accommodate servicing inside as well as a fire isolation section and a truck wash.

View case study

Feature article

Dawn McKenzie indoor dressage arena 3_gallery

Benefits of installing an arena cover

For equestrian enthusiasts, trainers, and horse owners alike, an indoor arena represents a major asset. This article highlights the benefits of having an indoor equestrian space.

Read more

Latest case study

Perry Demolition combined office and warehouse 5_gallery

Combined office and warehouse 

Perry Demolition's requirements were for a new premises that included a stylish reception area with a double-storey void, a unique façade, and angled canopies, including a deck. 

View case study

Australian Workstation Manufacturers combined office and manufacturing building

Project overview

Australian Workstation Manufacturers design, manufacture and supply commercial furniture and joinery to projects of scale. They pride themselves on flexibility, superior quality, and the ability to offer the best lead times in the industry. 

We were engaged to design, value engineer, manufacture and install the steelwork for a new office and manufacturing building specifically to enhance productivity and efficiency.  

Project Value: 

  • $950K*

Building dimensions:

  • 149m x 28m

On-site build time:

  • 24 weeks

Job site location:

  • Fairfield East, New South Wales

Our scope and build details:

  • 3D structural model. 
  • Fabricated hot-dipped galvanised steel package. 
  • Purlins and girts.
  • Colorbond roof cladding.
  • Blanket and safety mesh in the roof. 
  • Designed around hail loadings. 
  • Wonderglass skylights. 
  • Installation of structural steel and roofing.

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

AWM combined office and manufacturing building
AWM office and manufacturing building
AWM commercial complex
AWM combined office and manufacturing building

Challenges and solutions

AWM required the structure to be engineered to take extra loadings on the roof to withstand large hailstorms and hail loadings. This future-proofed the building for AWM to make sure their business was not affected by future adverse weather. 

The structure had to work with AWM’s own footing and slab design as they were to dig out the ground after the roof was installed to allow for an underground carpark under the warehouse. The structure also had to work with AWM’s own concrete wall panel system and be built between existing buildings.  

“I would definitely build with Central Steel Build again. The product is a great product, it’s Australian-made, and we had no issues at all with anything. They were also incredibly helpful and accommodating when design changes were made.”
Ric Lewarne
Managing Director of AWM