Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Scone Regional Livestock Selling Centre saleyard cover 1_gallery

To ensure an accurate fit and functionality, the saleyards cover must precisely match the leveling contours. We conducted a thorough site scan and carefully measured the existing yards to align perfectly with the natural topography.

View case study

Feature article
Portland Aluminium & Glass combined office and manufacturing building 16_tile


Top Advantages of Using Clear Span Sheds

We understand the importance of enhanced versatility in your structures. Our clearspan sheds are designed to cater to numerous applications, making them the perfect choice for various needs. 

Read more

Latest case study
Amy Slayter indoor dressage arena 16_tile


Slayter Equestrian Facility

Our client approached us with a vision for her dream equestrian facility, a bespoke indoor dressage arena and stable complex designed to accommodate her own horses and appeal to high-end clientele. 

View case study

Buildspec Constructions multi-tenant factory and office complex

Project overview

Buildspec Constructions has a longstanding partnership with Central Steel Build, collaborating on various construction projects ranging from simple skillions to large and complex fit-outs. The Paddys Drive development presented a unique opportunity as an investment project.

Our client sought a steelwork package for a pre-cast concrete multi-tenant factory and office complex. By using a pre-cast concrete construction method combined with a value-engineered steel frame, individual tenancies within the same structure could be purchased and sold separately.

Project Value: 

  • $650K*

Building dimensions:

  • 52m x 14m
  • 51m x 15m
  • 46m x 12m

On-site build time:

  • 17 weeks

Job site location:

  • Delacombe, Victoria

Our scope and build details:

  • 3D structural model.
  • Pre-cast panels design.
  • Concrete slab design.
  • Fabricated hot-dipped galvanised steel package.
  • Purlins and girts.
  • Guttering and downpipe system.
  • Blanket insulation and safety mesh.
  • Custom sized roller shutter openings.
  • Two 5kPa mezzanines.

Project collaborators: 

  • Civil engineer.
  • Buildspec Constructions.
  • Third-party installer. 

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Sam Ballantyne multi-tenant factory and office complex
Sam Ballantyne commercial building
Sam Ballantyne multi-tenant factory and office complex
Sam Ballantyne multi-tenant factory and office complex
Sam Ballantyne factory and office complex
Sam Ballantyne commercial shed

Challenges and solutions

One of the key challenges we encountered was the need to create efficient portal frame spans that aligned with the mezzanines, effectively reducing the steel load which was a crucial factor for the overall success of the project.

“End-to-end CSB was able to provide us with a structural and building design which we were able to tailor to suit the specific needs of the site. The fact that we were given a project manager to liaise with and a shed builder that we were able to contact all the time that just proves to be invaluable.”
Sam Ballantyne
Buildspec Constructions, Project Manager

Love what you see?

Get an obligation free quote today.