Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

Professionally designed dairy barns built for success. Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Serafin Ag Pro combined showroom and workshop 2_gallery

The structure was divided into several purpose-built spaces including retail services and display, offices, amenities, equipment services, and spare parts sales. 

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Leader industrial warehouse 3_gallery

NMGS industrial warehouse 

The new warehouse needed to fit in with the existing infrastructure onsite and feature 10m eave heights to increase vertical storage capacity. 

View case study

Buildspec Constructions multi-tenant factory and office complex

Project overview

Buildspec Constructions has a longstanding partnership with Central Steel Build, collaborating on various construction projects ranging from simple skillions to large and complex fit-outs. The Paddys Drive development presented a unique opportunity as an investment project.

Our client sought a steelwork package for a pre-cast concrete multi-tenant factory and office complex. By using a pre-cast concrete construction method combined with a value-engineered steel frame, individual tenancies within the same structure could be purchased and sold separately.

Project Value: 

  • $650K*

Building dimensions:

  • 52m x 14m
  • 51m x 15m
  • 46m x 12m

On-site build time:

  • 17 weeks

Job site location:

  • Delacombe, Victoria

Our scope and build details:

  • 3D structural model.
  • Pre-cast panels design.
  • Concrete slab design.
  • Fabricated hot-dipped galvanised steel package.
  • Purlins and girts.
  • Guttering and downpipe system.
  • Blanket insulation and safety mesh.
  • Custom sized roller shutter openings.
  • Two 5kPa mezzanines.

Project collaborators: 

  • Civil engineer.
  • Buildspec Constructions.
  • Third-party installer. 

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Sam Ballantyne multi-tenant factory and office complex
Sam Ballantyne commercial building
Sam Ballantyne multi-tenant factory and office complex
Sam Ballantyne multi-tenant factory and office complex
Sam Ballantyne factory and office complex
Sam Ballantyne commercial shed

Challenges and solutions

One of the key challenges we encountered was the need to create efficient portal frame spans that aligned with the mezzanines, effectively reducing the steel load which was a crucial factor for the overall success of the project.

“End-to-end CSB was able to provide us with a structural and building design which we were able to tailor to suit the specific needs of the site. The fact that we were given a project manager to liaise with and a shed builder that we were able to contact all the time that just proves to be invaluable.”
Sam Ballantyne
Buildspec Constructions, Project Manager

Love what you see?

Get an obligation free quote today.