Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

Professionally designed dairy barns built for success. Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Serafin Ag Pro combined showroom and workshop 2_gallery

The structure was divided into several purpose-built spaces including retail services and display, offices, amenities, equipment services, and spare parts sales. 

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Leader industrial warehouse 3_gallery

NMGS industrial warehouse 

The new warehouse needed to fit in with the existing infrastructure onsite and feature 10m eave heights to increase vertical storage capacity. 

View case study

Calderwood Christian School ball court cover

Project overview

After being approached by the Calderwood Christian School for a new ball court cover, Multifab contacted us to design, engineer and construct the building. The cover needed to fit around the existing basketball court and provide maximum weather protection whilst maintaining open sides.

Project Value: 

  • $100K*

Building dimensions:

  • 32m x 19m x 5m

On-site build time:

  • 2.5 weeks

Project collaborators: 

  • Structural engineer
  • Multifab
  • Geotechnical engineer

Our scope and build details:

  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Roof cladding
  • Guttering and downpipe system
  • Wonderglas skylights
  • Gable infills
Job site location:
  • Calderwood, New South Wales
 

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Calderwood Christian School ball court cover
Calderwood Christian School recreational shed
Calderwood Christian School sports field cover
Calderwood Christian School ball court cover
Calderwood Christian School recreational shed
Calderwood Christian School sports field cover

Challenges and solutions

We needed to design the building around the perimeter of the existing ball court cover. Caution was also required by Multifab whilst installing the building to not damage the court surface.

To maximise weather protection underneath the ball court cover, we designed the structure with gable infills. This allowed the building to remain open sided whilst providing better shelter inside.

“Central Steel Build were very easy to deal with, they offered competitive pricing, everything was on time throughout the whole construction process and the building went up fast. Overall, they were a real pleasure to deal with.”
Dave Muscat
Multifab

Love what you see?

Get an obligation free quote today.