Feature case study

Scone Regional Livestock Selling Centre saleyard cover 1_gallery

To ensure an accurate fit and functionality, the saleyards cover must precisely match the leveling contours. We conducted a thorough site scan and carefully measured the existing yards to align perfectly with the natural topography.

View case study

Feature article
Portland Aluminium & Glass combined office and manufacturing building 16_tile


Top Advantages of Using Clear Span Sheds

We understand the importance of enhanced versatility in your structures. Our clearspan sheds are designed to cater to numerous applications, making them the perfect choice for various needs. 

Read more

Latest case study
Amy Slayter indoor dressage arena 16_tile


Slayter Equestrian Facility

Our client approached us with a vision for her dream equestrian facility, a bespoke indoor dressage arena and stable complex designed to accommodate her own horses and appeal to high-end clientele. 

View case study

Charlton Park clubroom

Project overview

The Charlton Park board approached us with an idea for a large sports pavilion including function rooms, change rooms, toilets, storage area, kitchen and canteen, bar, and an entry/reception area.

Project Value: 

  • $400-500K*

Building dimensions:

  • 84m x 24m x 5m

Project collaborators:

  • MKM Constructions
  • Geotech and Fire Engineer 

Our scope and build details:

  • Structural steel drawings, engineering certificate and computations.
  • Structural concrete engineering including slab design.
  • 3D structural/shop steel drawings.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts.
  • Roof cladding and cappings.
  • Framed out door openings.
  • Eaves.

*All prices are an indication only and are subject to change at any time due to industry steel prices. The prices also do not include erection or site preparation.

Charlton Park club rooms
Charlton Park recreational club room
Charlton Park clubrooms drawings

Challenges and solutions

We collaborated closely with MKM Constructions who was managing the project as commercial builder throughout the design stages. It was necessary to ensure all architectural details were taken account in the structural steel design.

As the building site was identified as flood-prone, we designed the structural frame with extended columns that allowed for retaining walls installed to raise the building floor level.