Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

 Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Powercor industrial depot 2_gallery

The building needed to have a 50m clear span width to accommodate servicing inside as well as a fire isolation section and a truck wash.

View case study

Feature article

Dawn McKenzie indoor dressage arena 3_gallery

Benefits of installing an arena cover

For equestrian enthusiasts, trainers, and horse owners alike, an indoor arena represents a major asset. This article highlights the benefits of having an indoor equestrian space.

Read more

Latest case study

Perry Demolition combined office and warehouse 5_gallery

Combined office and warehouse 

Perry Demolition's requirements were for a new premises that included a stylish reception area with a double-storey void, a unique façade, and angled canopies, including a deck. 

View case study

Kyneton Elders combined retailed and hardware store

Project overview

Our client wanted a fast project delivery and economical structure that was compliant with their existing planning permit drawings. They required an insulated office/showroom and large warehouse. The building needed to provide sufficient return on investment (ROI) for our client whilst servicing all of the tenant's (Elders Kyneton) demands.

Project Value: 

  • $350-600K*

Building dimensions:

  • 55m x 30m

On-site build time:

  • 8 weeks

Project collaborators:

  • JDZ Building Design
  • Consulting geologist 
  • Owner builder 

Our scope and build details:

  • Structural steel drawings, engineering certification.
  • Engineering computations.
  • Structural concrete engineering including raft slab design for office.
  • 3D structural/shop steel drawings.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts.
  • Glazing beam for client's front glazed entry.
  • Supply and install of industrial roller shutter doors.
  • Cantilever canopy on side of main warehouse.
  • Veranda around office/showroom area.

Job site location:

  • Kyneton, Victoria

*All prices are an indication only and are subject to change at any time due to industry steel prices. The prices also do not include erection or site preparation.

Elders kyneton commercial complex
Elders kyneton commercial retail shed
Elders kyneton commercial retail and hardstore shed
Elders Kyneton office and warehouse drawing

Challenges and solutions

Our client envisaged a glazed front opening which meant extra support was required for wind loading. Our solution was to provide a structural glazing beam at the top of the glazing.

Large roller shutters were needed on each side of the warehouse. We designed the 5m cantilever canopy above the roller shutters to ensure the weather wouldn't affect functionality of the doors.

Love what you see?

Get an obligation free quote today.