Professionally designed dairy barns built for success. Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Serafin Ag Pro combined showroom and workshop 2_gallery

The structure was divided into several purpose-built spaces including retail services and display, offices, amenities, equipment services, and spare parts sales. 

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Leader industrial warehouse 3_gallery

NMGS industrial warehouse 

The new warehouse needed to fit in with the existing infrastructure onsite and feature 10m eave heights to increase vertical storage capacity. 

View case study

Gason factory

Project overview

Gason, a rapidly expanding farm machinery manufacturer, sought to construct a cutting-edge new facility to enhance their manufacturing capacity and accommodate their state-of-the-art mechanised storage system.

Central Steel Build's team tailored the building design meticulously to seamlessly integrate with Gason's machinery and lean manufacturing operation, ensuring maximum operational efficiency and effective use of the space.

The project was strategically divided into two phases to align with Gason's growth strategy. This phased approach would enable Gason to have minimal disruption to business operations, and allow them to establish and streamline their processes before commencing the second phase.

Project Value: 

  • $1.04M*

Building dimensions:

  • 63m x 41m x 9m

On-site build time:

  • Main building: 21 weeks
  • Extension: 20 weeks

Project collaborators: 

  • MKM Construction
  • Civil engineer
  • Third-party installer

Our scope and build details:

  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Roof and wall cladding
  • Canopy rafters
  • Personal access doors
  • Sliding doors
  • 55mm blanket and mesh
  • Openings for dado panel
  • Roof split
  • Galvanised angle
  • Double column
Job site location:
  • Ararat, Victoria
 

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Gason factory
Gason industrial building factory
Gason large industrial factory
Gason factory
Gason industrial building factory
Gason large industrial building

Challenges and impact

The Central Steel Build design team collaborated closely with the commercial builder MKM Constructions to proactively address all of Gason’s specifications, strategically creating an interconnected open breezeway to connect the two stages of the construction. To ensure effective compartmentalisation against fire hazards, we designed the second structure to incorporate a fire separation wall along the end that faced the first structure.

This second stage of the project enables Gason to further optimise its manufacturing processes by introducing an automated storage system for small parts crucial in the assembly of its farm machinery products, thereby enhancing efficiency and productivity. 