Glenvale School ball court cover
Project overview
Glenvale wanted to improve on-campus infrastructure to provide students with a premium learning experience. The school contacted us with the idea of a multifunctional sports complex including a basketball court, amenities, several tech rooms and an overhead mezzanine.
Project Value:
- $350-400K*
Building dimensions:
- 36m x 24m plus classrooms
On-site build time:
- 13 weeks
Project collaborators:
- Planwise Architects
- Consulting Geologist
Our scope and build details:
- Structural steel drawings, engineering certification and computations.
- Structural concrete engineering including raft slab design for classrooms, and precast design.
- 3D structural/shop steel drawings.
- Fabricated hot dipped galvanised steel package.
- Purlins and girts.
- Hip roof classroom area.
- Roof blanket insulation.
- Structural mezzanine floor.
- Roof and wall cladding.
Job site location:
- Glenvale, Queensland
*All prices are an indication only and are subject to change at any time due to industry steel prices. The prices also do not include erection or site preparation.
![Glenvale basketball court cover](https://www.centralbuild.com.au/hs-fs/hubfs/Website/Website%20case%20studies/Glenvale%20School/Glenvale%20basketball%20court%20cover.jpg?width=1220&height=691&name=Glenvale%20basketball%20court%20cover.jpg)
![Glenvale recreational court cover](https://www.centralbuild.com.au/hs-fs/hubfs/Website/Website%20case%20studies/Glenvale%20School/Glenvale%20court%20cover.jpg?width=1421&height=445&name=Glenvale%20court%20cover.jpg)
![Glenvale School recreational shed](https://www.centralbuild.com.au/hs-fs/hubfs/Website/Website%20case%20studies/Glenvale%20School/Glenvale%20School%20recreational%20shed.png?width=447&height=342&name=Glenvale%20School%20recreational%20shed.png)
![Glenvale School ball court cover drawing](https://www.centralbuild.com.au/hs-fs/hubfs/Website/Website%20case%20studies/Glenvale%20School/Glenvale%20School%20ball%20court%20cover%20drawings-1.png?width=2482&height=976&name=Glenvale%20School%20ball%20court%20cover%20drawings-1.png)
Challenges and solutions
Our building design team worked closely with the architect to ensure an economical and practical design was achieved and for a seamless installation process. An external brickwork façade needed to be incorporated into the concrete slab design, meanwhile we provided engineering for a 2m high retaining wall to run alongside the building.