Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

 Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Powercor industrial depot 2_gallery

The building needed to have a 50m clear span width to accommodate servicing inside as well as a fire isolation section and a truck wash.

View case study

Feature article

Dawn McKenzie indoor dressage arena 3_gallery

Benefits of installing an arena cover

For equestrian enthusiasts, trainers, and horse owners alike, an indoor arena represents a major asset. This article highlights the benefits of having an indoor equestrian space.

Read more

Latest case study

Perry Demolition combined office and warehouse 5_gallery

Combined office and warehouse 

Perry Demolition's requirements were for a new premises that included a stylish reception area with a double-storey void, a unique façade, and angled canopies, including a deck. 

View case study

Kalianna School playground cover

Project overview

We were approached by Searle Bros. commercial builders to provide the steelwork package for an open-sided playground cover at Kalianna School in North Bendigo. This project had challenging site conditions including tight access and the need for land clearing. 

The building itself required special attention in the design phase to accommodate our client’s requests for specific bay sizes, clearance heights, and custom cladding on the roof. 

Project Value: 

  • $110K*

Building dimensions:

  • 21m x 23m x 6.85m

On-site build time:

  • 3 weeks

Project collaborators: 

  • Civil engineer
  • Searle Bros.
  • Geotechnical engineer
  • Architect 

Our scope and build details:

  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Roof cladding
  • 1700mm eaves
  • Wall bracing
  • Skylights 

Job site location:

  • North Bendigo, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Kalianna School playground cover shed
Kalianna School playground cover
Kalianna School playground cover shed
Kalianna School playground cover
Kalianna School recreational shed
Kalianna School playground cover 11_tile

Challenges and solutions

Through the design stages, we faced several challenges, the most difficult of which was tight site access. We needed to design the building around the existing infrastructure on-site and include allowance for the clearing of trees in the building’s location.

We designed and value-engineered the building to be in line with our client’s requested clearance heights, specified bay sizes, and ground levels.

The client requested a strip of translucent cladding running down the center of the roof. To accommodate this, we set up the roof purlins at different heights and left an opening in the roof for the intended cladding.

Love what you see?

Get an obligation free quote today.