Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

 Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Powercor industrial depot 2_gallery

The building needed to have a 50m clear span width to accommodate servicing inside as well as a fire isolation section and a truck wash.

View case study

Feature article

Dawn McKenzie indoor dressage arena 3_gallery

Benefits of installing an arena cover

For equestrian enthusiasts, trainers, and horse owners alike, an indoor arena represents a major asset. This article highlights the benefits of having an indoor equestrian space.

Read more

Latest case study

Perry Demolition combined office and warehouse 5_gallery

Combined office and warehouse 

Perry Demolition's requirements were for a new premises that included a stylish reception area with a double-storey void, a unique façade, and angled canopies, including a deck. 

View case study

Kerfab Industries combined office and manufacturing building

Project overview

After initially providing extensions to Kerfab’s other factories, they approached us for a quote on their new facility. We worked through initial discussions about the project together, and for a turnkey solution, the job proceeded to go through MKM Constructions as the commercial builder. 

Special design requirements were taken into consideration including gantry crane loadings, an attached office building with a façade including decorative fins and double canopies.

Project Value: 

  • $311K*

Building dimensions:

  • 72m x 24m x 7.4m

On-site build time:

  • 4 weeks

Project collaborators: 

  • Civil engineer 
  • MKM Constructions
  • Geotechnical engineer
  • McKnight & Bray Building Designers

Our scope and build details:

  • 3D structural model.
  • Fabricated hot-dipped galvanised steel package.
  • Purlins and girts.
  • Roller shutter openings.
  • Roof safety mesh.
  • Anticon blanket insulation.
  • Structural steelwork for architectural fins.
  • 5 kPa mezzanine.
  • Toe flashing.
  • Stubs for client’s gantry crane.

Job site location:

  • Kerang, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Kerfab Industries combined office and warehouse
Kerfab Industries commercial building
Kerfab Industries manufacturing shed
Kerfab Industries commercial shed building
Kerfab Industries office shed space
Kerfab Industries commercial property
Kerfab Industries commercial space
Kerfab Industries manufacturing space
Kerfab Industries combined office and warehouse shed

Challenges and solutions

We liaised with Kerfab through the design process to ensure practicality and external aesthetics were achieved. Furthermore, we ensured that all elements of the building were value-engineered to deliver an economical and durable result.  

“The new building has all gone together well. We would admit we had a few issues with the build process and the final finish on some of the office, but these have all been rectified and I cannot fault the shed.”
Jay Chirnside
General Manager

Love what you see?

Get an obligation free quote today.