Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost.

Download our Capability Statement

Feature case study

Serafin Ag Pro combined showroom and workshop 2_gallery

The structure was divided into several purpose-built spaces including retail services and display, offices, amenities, equipment services, and spare parts sales. 

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Leader industrial warehouse 3_gallery

NMGS industrial warehouse 

The new warehouse needed to fit in with the existing infrastructure onsite and feature 10m eave heights to increase vertical storage capacity. 

View case study

Leopold Swim School clubroom

Project overview

Leopold swimming school needed an upgraded competition-sized pool to service its ever-expanding customer base. The requirements were to fit a 25m x 6m pool and pool cover beside the existing facility within the space available.

A pump shed needed to be incorporated into the design and the new build needed to blend into the existing structure.

Project Value: 

  • $120K*

Building dimensions:

  • 28m x 10m x 3.3m

Project collaborators: 

  • Civil engineer
  • MKM Constructions 

Our scope and build details:

  • 3D structural model.
  • Fabricated hot-dipped galvanised steel package.
  • HDG roof purlins.
  • Skillion roof design.
  • Guttering and downpipes.
  • Eave overhang.
  • Foundation design.

Job site location:

  • Leopold, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Leopold Swim School clubrooms
Leopold Swim School recreational facility
Leopold Swim School recreational shed clubroom

Challenges and solutions

A fully hot-dipped galvanised frame was adopted to ensure longevity within a potentially corrosive environment and the roof purlins were upgraded to heavy-duty RHS, allowing insulated roof panels to be used. The foundations also needed to be designed to accommodate the pool depth to ensure structural stability.

Love what you see?

Get an obligation free quote today.