Feature case study

Powercor industrial depot 2_gallery

The building needed to have a 50m clear span width to accommodate servicing inside as well as a fire isolation section and a truck wash.

View case study

Feature article

Dawn McKenzie indoor dressage arena 3_gallery

Benefits of installing an arena cover

For equestrian enthusiasts, trainers, and horse owners alike, an indoor arena represents a major asset. This article highlights the benefits of having an indoor equestrian space.

Read more

Latest case study

Perry Demolition combined office and warehouse 5_gallery

Combined office and warehouse 

Perry Demolition's requirements were for a new premises that included a stylish reception area with a double-storey void, a unique façade, and angled canopies, including a deck. 

View case study

OneSchool Global clubroom

Project overview

OneSchool Global Melton campus is Victoria’s largest site, housed in a state-of-the-art facility at the heart of High Street, Melton. The school has learning spaces for both primary and secondary students. 

Project Value: 

  • $950K* 

Building dimensions:

  • Approximate total area 2,575m2 

On-site build time:

  • 18 weeks

Project collaborators: 

  • Structure Solutions
  • MKM Constructions
  • Bill Jacobs Pty Ltd 
  • Hardrock Geotechnical

Our scope and build details:

  • Structural concrete engineering.  
  • 3D structural model. 
  • Fabricated hot dipped galvanised steel package. 
  • Hold down footing bolts. 
  • Purlins and girts.
  • Mezzanine floor including bearers and studs.
  • Lift void.
  • Cantilever verandas.

Job site location:

  • Melton, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

OneSchool Global Melton Campus club rooms
OneSchool Global Melton Campus recreational clubroom
OneSchool Global Melton Campus clubroom shed

Challenges and solutions

It was a challenge to minimise the internal support posts that support the first-floor structure, hence large floor beams were introduced to overcome this.  

External clear span fascia trusses were integrated into the steelwork package to help brace the building and provide support and fixes for the many and varied size windows to allow plenty of natural light.  

Extra steelwork had to be designed in the clubrooms to accommodate the stage curtain and also basketball backboards. 