Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

Professionally designed dairy barns built for success. Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Serafin Ag Pro combined showroom and workshop 2_gallery

The structure was divided into several purpose-built spaces including retail services and display, offices, amenities, equipment services, and spare parts sales. 

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Leader industrial warehouse 3_gallery

NMGS industrial warehouse 

The new warehouse needed to fit in with the existing infrastructure onsite and feature 10m eave heights to increase vertical storage capacity. 

View case study

OneSchool Global clubroom

Project overview

OneSchool Global Melton campus is Victoria’s largest site, housed in a state-of-the-art facility at the heart of High Street, Melton. The school has learning spaces for both primary and secondary students. 

Project Value: 

  • $950K* 

Building dimensions:

  • Approximate total area 2,575m2 

On-site build time:

  • 18 weeks

Project collaborators: 

  • Structure Solutions
  • MKM Constructions
  • Bill Jacobs Pty Ltd 
  • Hardrock Geotechnical

Our scope and build details:

  • Structural concrete engineering.  
  • 3D structural model. 
  • Fabricated hot dipped galvanised steel package. 
  • Hold down footing bolts. 
  • Purlins and girts.
  • Mezzanine floor including bearers and studs.
  • Lift void.
  • Cantilever verandas.

Job site location:

  • Melton, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

OneSchool Global Melton Campus club rooms
OneSchool Global Melton Campus recreational clubroom
OneSchool Global Melton Campus clubroom shed

Challenges and solutions

It was a challenge to minimise the internal support posts that support the first-floor structure, hence large floor beams were introduced to overcome this.  

External clear span fascia trusses were integrated into the steelwork package to help brace the building and provide support and fixes for the many and varied size windows to allow plenty of natural light.  

Extra steelwork had to be designed in the clubrooms to accommodate the stage curtain and also basketball backboards. 

Love what you see?

Get an obligation free quote today.