Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Scone Regional Livestock Selling Centre saleyard cover 1_gallery

The saleyards' alignment with the natural topography required a cover designed to match the levelling contours precisely. Also, maintaining uninterrupted saleyard operations was critical, so we developed a staged construction plan to complete the project efficiently without causing disruptions.

View case study

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Robyn Boyle combined indoor arena and stable complex 1_tile


Boyle indoor dressage arena and stable complex

Our client, a dedicated dressage rider and trainer in Scone, NSW, approached us for a combined indoor dressage arena and stable complex to prevent weather disruptions. Her vision focused on horse and rider safety with a shallow roof gradient to blend with her existing property infrastructure. The incorporation of a curved roofline was our solution to achieving an unobtrusive roof design.

View case study

Keysborough Powercor industrial depot

Project overview

Central Steel Build was commissioned by Powercor to value-engineer and construct a new industrial depot in Keysborough, following previous collaborations across other parts of Victoria. B2B Project and Construction Management, with whom Central Steel Build has a longstanding partnership, managed the project and provided the initial plans. Leveraging these plans, our structural drafting team optimised the design for cost-effectiveness, incorporating a small parapet along the front and enhancing the façade to elevate the architectural appeal of the structure.

Project Value: 

  • $534K*

Building dimensions:

  • 87.5m x 30m x 6.8m

On-site build time:

  • 24 weeks

Project collaborators: 

  • Civil engineer 

  • B2B Project and Construction Management

Our scope and build details:

  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Roof and wall cladding
  • Guttering and downpipe system
  • Personal access doors
  • Roof safety mesh
  • Architectural facade design with geometric angles
  • Horizontal cladding on façade
  • Parapet
  • Colour-matched cladding to existing infrastructure
Job site location:
  • Keysborough, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Industrial depot
Industrial depot building
Large industrial building
Industrial depot
Industrial depot building
Large industrial building
Industrial depot
Industrial depot building
Large industrial building

Project success and impact

In collaboration with Powercor and B2B Project and Construction Management, we optimised cladding options and parapet heights for a more cost-effective structural solution.

Through our value engineering, unnecessary architectural elements were minimised to enhance building functionality. The design features large vehicle storage at the rear, complemented by office space at the front, with a unique cladding design for branding and aesthetic appeal.

Love what you see?

Get an obligation free quote today.