Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Scone Regional Livestock Selling Centre saleyard cover 1_gallery

To ensure an accurate fit and functionality, the saleyards cover must precisely match the leveling contours. We conducted a thorough site scan and carefully measured the existing yards to align perfectly with the natural topography.

View case study

Feature article
Portland Aluminium & Glass combined office and manufacturing building 16_tile


Top Advantages of Using Clear Span Sheds

We understand the importance of enhanced versatility in your structures. Our clearspan sheds are designed to cater to numerous applications, making them the perfect choice for various needs. 

Read more

Latest case study
Amy Slayter indoor dressage arena 16_tile


Slayter Equestrian Facility

Our client approached us with a vision for her dream equestrian facility, a bespoke indoor dressage arena and stable complex designed to accommodate her own horses and appeal to high-end clientele. 

View case study

Trans Air & Electrics industrial workshop

Project overview

The client approached us directly to build a new workshop and office where he could run his truck-auto-electrical and air-conditioning business workshop as he had outgrown his existing premises. He required the design to be economical with a specific budget to work within, to make the build viable.

A must include: small front canopies with integrated box gutter designs, boxed out front on canopies with split heights for client's own architectural cladding. The brief also outlined a mandatory incorporation of a 5kpa mezzanine for storage which was to be above his office area.

Project Value: 

  • $200-300K*

On-site build time:

  • 4 weeks

Job site location:

  • East Bendigo, Victoria

Project collaborators:

  • Provincial Geotechnical
  • Architect/draftsperson 
  • Earthmoving contractor 
  • Concrete panel supplier 
  • Roller shutter supplier
  • Builder for fit-out works
 

Our scope and build details:

  • Structural steel drawings, engineering certification and computations.
  • Structural concrete engineering including slab and office slab design.
  • Concrete panels engineering and design.
  • 3D structural/shop steel drawings.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts.
  • External steel cladding.
  • Industrial fire egress compliant access doors.
  • Guttering and above ground rainwater systems.
  • Roof insulation.
  • Box guttering on office canopy.
  • Customized storage mezzanine floor.
  • Parapet walls for office and front of warehouse.
  • Architectural parapet for front office canopies.
  • Glazing beam and opening for clients own architectural glazing.

*All prices are an indication only and are subject to change at any time due to industry steel prices. The prices also do not include erection or site preparation.

Trans Air and Electric industrial space
Trans Air & Electrics industrial facility
Trans Air & Electrics workshop shed
Trans Air Electrics workshop drawing

Challenges and solutions

There were no specific challenges apart from working within a specific budget, a challenge we always rise to and find solutions to achieve.

Love what you see?

Get an obligation free quote today.