Feature case study

Powercor industrial depot 2_gallery

The building needed to have a 50m clear span width to accommodate servicing inside as well as a fire isolation section and a truck wash.

View case study

Feature article

Dawn McKenzie indoor dressage arena 3_gallery

Benefits of installing an arena cover

For equestrian enthusiasts, trainers, and horse owners alike, an indoor arena represents a major asset. This article highlights the benefits of having an indoor equestrian space.

Read more

Latest case study

Perry Demolition combined office and warehouse 5_gallery

Combined office and warehouse 

Perry Demolition's requirements were for a new premises that included a stylish reception area with a double-storey void, a unique façade, and angled canopies, including a deck. 

View case study

Visy factory

Project overview

Visy reached out to us during the feasibility stage of a new drum pulper facility. The building would hold a large piece of machinery that recycles cardboard into paper. Visy approached us to determine the most economical structure for the required purpose and to see how CSB could take part in the project.

After comparing several quotes, Visy decided to work with us for the project due to the impressively short lead times offered. The entire structural design was pre-engineered, so our project scope was structural drawings, fabrication, and construction of the building.

We collaborated closely, employing advanced 3D modeling and clash detection techniques with Visy, the civil engineer, and drum pulper suppliers to ensure seamless detailing, fabrication, and installation within a tight schedule.

Project Value: 

  • $1M*

Building dimensions:

  • 56m x 20m x 15m

On-site build time:

  • 38 weeks

Project collaborators: 

  • Third-party installer
  • Civil engineer
  • Drum pulper suppliers

Our scope and build details:

  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Roof cladding
  • Roof safety mesh
  • Roof panels
  • Guttering and downpipe system
  • Ridge and barge flashing
  • Gantries for internal and external pipework

Job site location:

  • Coolaroo, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Visy factory
Visy industrial building factory
Visy industrial shed factory
Visy factory
Visy industrial building factory
Visy industrial shed factory

Challenges and solutions

There were several challenges on this project including tight tolerances, pre-cambering of large beams, curved gantry beams, coordination of pipework and equipment, and identifying any clashes between all parties. 

“I highly recommend Central Steel Build for their exceptional support throughout the entire project life cycle. From insightful design assistance to manufacturing, timely delivery and dedicated after-sales service, they consistently met the project timeline expectations. Their commitment to quality sets them apart in the industry.”
Kevin Borgis
Visy