Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

Professionally designed dairy barns built for success. Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Serafin Ag Pro combined showroom and workshop 2_gallery

The structure was divided into several purpose-built spaces including retail services and display, offices, amenities, equipment services, and spare parts sales. 

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Leader industrial warehouse 3_gallery

NMGS industrial warehouse 

The new warehouse needed to fit in with the existing infrastructure onsite and feature 10m eave heights to increase vertical storage capacity. 

View case study

Visy factory

Project overview

Visy reached out to us during the feasibility stage of a new drum pulper facility. The building would hold a large piece of machinery that recycles cardboard into paper. Visy approached us to determine the most economical structure for the required purpose and to see how CSB could take part in the project.

After comparing several quotes, Visy decided to work with us for the project due to the impressively short lead times offered. The entire structural design was pre-engineered, so our project scope was structural drawings, fabrication, and construction of the building.

We collaborated closely, employing advanced 3D modeling and clash detection techniques with Visy, the civil engineer, and drum pulper suppliers to ensure seamless detailing, fabrication, and installation within a tight schedule.

Project Value: 

  • $1M*

Building dimensions:

  • 56m x 20m x 15m

On-site build time:

  • 38 weeks

Project collaborators: 

  • Third-party installer
  • Civil engineer
  • Drum pulper suppliers

Our scope and build details:

  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Roof cladding
  • Roof safety mesh
  • Roof panels
  • Guttering and downpipe system
  • Ridge and barge flashing
  • Gantries for internal and external pipework

Job site location:

  • Coolaroo, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Visy factory
Visy industrial building factory
Visy industrial shed factory
Visy factory
Visy industrial building factory
Visy industrial shed factory

Challenges and solutions

There were several challenges on this project including tight tolerances, pre-cambering of large beams, curved gantry beams, coordination of pipework and equipment, and identifying any clashes between all parties. 

“I highly recommend Central Steel Build for their exceptional support throughout the entire project life cycle. From insightful design assistance to manufacturing, timely delivery and dedicated after-sales service, they consistently met the project timeline expectations. Their commitment to quality sets them apart in the industry.”
Kevin Borgis
Visy

Love what you see?

Get an obligation free quote today.