Feature case study

Powercor industrial depot 2_gallery

The building needed to have a 50m clear span width to accommodate servicing inside as well as a fire isolation section and a truck wash.

View case study

Feature article

Dawn McKenzie indoor dressage arena 3_gallery

Benefits of installing an arena cover

For equestrian enthusiasts, trainers, and horse owners alike, an indoor arena represents a major asset. This article highlights the benefits of having an indoor equestrian space.

Read more

Latest case study

Perry Demolition combined office and warehouse 5_gallery

Combined office and warehouse 

Perry Demolition's requirements were for a new premises that included a stylish reception area with a double-storey void, a unique façade, and angled canopies, including a deck. 

View case study

Westlab combined office and warehouse

Project overview

Westlab is a fast-growing company that required a large clear-span warehouse to accommodate long-span racking as well as large office space for future growth, including staff break-out and creative areas. They also required an undercover receiving and dispatch area on the building's east side. The structure had to be built to last in harsh environments.

Project Value: 

  • $400-500K*

On-site build time: 

  • 5 weeks

Job site location: 

  • Mitchell Park, Victoria
Project collaborators:
  • Project Now 
  • MKM Constructions 

Our scope and build details:

  • Structural steel drawings, engineering certification and computations.
  • Structural concrete engineering including raft slab design for office and precast panels.
  • 3D structural/shop steel drawings.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts.
  • Office steelwork.
  • Cantilever canopy.
  • Personal access doors.
  • Sisalation and mesh on the roof.
  • Roof and wall cladding.

*All prices are an indication only and are subject to change at any time due to industry steel prices. The prices also do not include erection or site preparation.

Westlab office and warehouse
Westlab commercial complex facility
Westlab office and warehouse drawings

Challenges and solutions

Working closely with MKM Constructions, we designed an economical solution for the office, ensuring suitable breakout areas and creative space, as well as a modern glazed office front with hidden rooflines. The large cantilever canopy was selected to be mounted off the reinforced east side of the main warehouse to accommodate inwards and outwards goods movement.

Our classic clear-span truss design was the obvious choice to provide unobstructed warehouse space. Our engineers provided a solution for 2.8m high horizontal clip-on precast panels that rely on the portal frame for support to guarantee hardwearing areas of the building are still workable in fifty years.