Skip to the main content.
Request a quote
Request a quote
Download our dairy barns guide

Vinnicombe freestall dairy barn_gallery 01

Professionally designed dairy barns built for success. Advanced dairy farm building design can future-proof your farm and set you up for generations. Learn more.

Download guide

Feature case study

Serafin Ag Pro combined showroom and workshop 2_gallery

The structure was divided into several purpose-built spaces including retail services and display, offices, amenities, equipment services, and spare parts sales. 

View case study

Feature article

Dominic Conheady dairy building 2_gallery

How to bring down the cost of your farm shed

Rising costs demand for cost-effective solutions. In this article, we've listed down practical options to achieve cost-efficiency without compromising the quality of your building.

Read more

Latest case study

Leader industrial warehouse 3_gallery

NMGS industrial warehouse 

The new warehouse needed to fit in with the existing infrastructure onsite and feature 10m eave heights to increase vertical storage capacity. 

View case study

Westlab combined office and warehouse

Project overview

Westlab is a fast-growing company that required a large clear-span warehouse to accommodate long-span racking as well as large office space for future growth, including staff break-out and creative areas. They also required an undercover receiving and dispatch area on the building's east side. The structure had to be built to last in harsh environments.

Project Value: 

  • $400-500K*

On-site build time: 

  • 5 weeks

Job site location: 

  • Mitchell Park, Victoria
Project collaborators:
  • Project Now 
  • MKM Constructions 

Our scope and build details:

  • Structural steel drawings, engineering certification and computations.
  • Structural concrete engineering including raft slab design for office and precast panels.
  • 3D structural/shop steel drawings.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts.
  • Office steelwork.
  • Cantilever canopy.
  • Personal access doors.
  • Sisalation and mesh on the roof.
  • Roof and wall cladding.

*All prices are an indication only and are subject to change at any time due to industry steel prices. The prices also do not include erection or site preparation.

Westlab office and warehouse
Westlab commercial complex facility
Westlab office and warehouse drawings

Challenges and solutions

Working closely with MKM Constructions, we designed an economical solution for the office, ensuring suitable breakout areas and creative space, as well as a modern glazed office front with hidden rooflines. The large cantilever canopy was selected to be mounted off the reinforced east side of the main warehouse to accommodate inwards and outwards goods movement.

Our classic clear-span truss design was the obvious choice to provide unobstructed warehouse space. Our engineers provided a solution for 2.8m high horizontal clip-on precast panels that rely on the portal frame for support to guarantee hardwearing areas of the building are still workable in fifty years.

Love what you see?

Get an obligation free quote today.